FY24 Port of Rosedale Multimodal Expansion: Great River Railroad Restoration Project

DOT-FRA FR-CCD-24-010
Posted: Oct 31, 2025 12:00:00 AM EDT
Closes: 11/21/2025

Funding Information

Estimated Total Funding
$8,175,000
Award Ceiling
$8,175,000
Expected Number of Awards
1
Cost sharing or matching is required for this grant.

Description

This Project is part of a larger effort to restore function to the Great River Railroad that runs from the Port of Rosedale to the Columbus and Greenville Railroad (CAGY) in Metcalf, MS. The larger effort is divided into two Phases. Under this Agreement, the Project will complete environmental review for both phases. Additionally, this Project will complete preliminary engineering, final design, and construction activities for Phase 1 of the larger effort. Under this Agreement, Phase 1 activities will include preliminary engineering, final design, and construction activities to repair the 31 mile railroad to be a functional track for maintenance equipment by replacing ties (approximately one-third of the timber rail ties), repairing 33 grade crossings, installing additional supplemental ballast rock, resurfacing track, repairing 4 timber bridges, replacing 1 timber bridge with culverts, and installing 1 concrete culvert.

Phase 2 of the restoration effort is anticipated to include installing approximately 31 miles of new 112–115-pound rail, additional tie replacement, the replacement of 4 bridges, and improvements to sidings (Port of Rosedale spur) in order to restore the track to a full operation. Besides environmental review, this Agreement does not fund activities for Phase 2.

Successful completion of the Project will enhance resiliency and redundancy for both the Port of Rosedale and the wider region.

Synopsis

This Project is part of a larger effort to restore function to the Great River Railroad that runs from the Port of Rosedale to the Columbus and Greenville Railroad (CAGY) in Metcalf, MS. The larger effort is divided into two Phases. Under this Agreement, the Project will complete environmental review for both phases. Additionally, this Project will complete preliminary engineering, final design, and construction activities for Phase 1 of the larger effort. Under this Agreement, Phase 1 activities will include preliminary engineering, final design, and construction activities to repair the 31 mile railroad to be a functional track for maintenance equipment by replacing ties (approximately one-third of the timber rail ties), repairing 33 grade crossings, installing additional supplemental ballast rock, resurfacing track, repairing 4 timber bridges, replacing 1 timber bridge with culverts, and installing 1 concrete culvert.

Phase 2 of the restoration effort is anticipated to include installing approximately 31 miles of new 112–115-pound rail, additional tie replacement, the replacement of 4 bridges, and improvements to sidings (Port of Rosedale spur) in order to restore the track to a full operation. Besides environmental review, this Agreement does not fund activities for Phase 2.

Successful completion of the Project will enhance resiliency and redundancy for both the Port of Rosedale and the wider region.

Eligibility

Eligible Applicants:
County governments

Funding Activity Categories

Transportation

CFDA Numbers

  • 20.337 - Consolidated Rail Infrastructure and Safety Improvements Program

Contact Information

Agency: DOT - Federal Railroad Administration
Contact: DOT - Federal Railroad Administration
Phone: 202-493-0112
GrantSolutions Help Desk

help@grantsolutions.gov

Phone Number: 1.866.577.0771 or 202.401.5282

Hours of operation are Monday-Friday from 9:00 a.m. to 6:00 p.m. ET
help@grantsolutions.gov

Additional Information

Document Type: synopsis
Opportunity Category: Discretionary
Version: 6
Last Updated: Nov 13, 2025 01:29:57 PM EST

Related Opportunities